The remainder of the line is operated as a rack railway, using the Abt system and with a maximum gradient of 15%. The first 5.5 km of the line is operated by conventional rail adhesion. The line is 12.5 km long and has a rail gauge of 1,000 mm. The line connects to the main R3 line at Ribes de Freser, but the stations have separate access. Download (OpenBVE): Download (BVE5): Lijn 1 van de metro van Busan (Nopo - Sinpyeong) Locatie: Busan, Republiek Korea Startdatum: 1985 Lengte: 32.5 km Aantal stations: 34 Spoorwijdte: 1.435 mm Download (OpenBVE): Download (BVE5): Metro pusanskie linia nr 1 (Nopo - Sinpyeong) Lokalizacja: Metropolia Pusan, Republika Korei Rok otwarcia: 1985. RAILWAY GAGES USED IN THIS REGION Nfo Nfo Nfo Nfo Nfo Nfo 2f000 0m610 =Tateyama 2f500 0m762 =LegacyEra LRVs 3f000 0m914 =LegacyEra LRVs 3f500 1m067 =Region Standard Trains+Routes Below Are This Gage Unless Other Noted 4f500 1m372 =LegacyEra LRVs 4f708 1m435 =HighSpeed +LegacyEra LRVs RAILCAR COUPLERS USED IN THIS REGION Nfo AARx =1925+Latr Wags +Loks 1925+Latr L&Hx =1925+Bfor Wags +Loks L.
0 Comments
Leave a Reply. |